DG Set Installation

DG Set Installation work includes

  • Exhaust Pipe Installation
    Design and installation of DG exhaust piping with proper insulation and routing to safely discharge hot gases and reduce noise and vibration.

 

  • MS Structure Supply & Fabrication
    Supply and fabrication of high-quality MS (Mild Steel) structures for DG mounting, exhaust support, and auxiliary equipment, ensuring strength, durability, and stability.

 
  • Structural Installation
    Erection of DG support structures, canopy supports, and vibration-isolated foundations as per site requirements.

 
  • Fuel Pipe Installation
    Installation of fuel supply and return pipelines with proper valves, filters, and safety arrangements for smooth and uninterrupted fuel flow.

 
  • BOT (Bulk Oil Tank)
    Complete BOT works including mounting of accessories, supports, and DG auxiliary systems for seamless operation.

 
  • Water Pipe Installation
    Installation of cooling water pipelines with leak-proof joints for efficient heat dissipation and engine protection.

 
  • RECD Installation
    Supply and installation of Residential Emission Control Devices (RECD) to comply with CPCB emission norms and environmental regulations.

 
  • Coil Cooler Installation
    Installation of radiator or coil cooler systems to maintain optimal engine temperature and enhance DG set performance.

 
  • Exhaust Pipe Insulation & Supports
    Thermal insulation of exhaust lines and installation of clamps and supports to ensure safety and minimize heat loss.

Scroll to Top