DG Set Installation
DG Set Installation work includes
Exhaust Pipe Installation
Design and installation of DG exhaust piping with proper insulation and routing to safely discharge hot gases and reduce noise and vibration.

MS Structure Supply & Fabrication
Supply and fabrication of high-quality MS (Mild Steel) structures for DG mounting, exhaust support, and auxiliary equipment, ensuring strength, durability, and stability.

Structural Installation
Erection of DG support structures, canopy supports, and vibration-isolated foundations as per site requirements.

Fuel Pipe Installation
Installation of fuel supply and return pipelines with proper valves, filters, and safety arrangements for smooth and uninterrupted fuel flow.

BOT (Bulk Oil Tank)
Complete BOT works including mounting of accessories, supports, and DG auxiliary systems for seamless operation.

Water Pipe Installation
Installation of cooling water pipelines with leak-proof joints for efficient heat dissipation and engine protection.

RECD Installation
Supply and installation of Residential Emission Control Devices (RECD) to comply with CPCB emission norms and environmental regulations.

Coil Cooler Installation
Installation of radiator or coil cooler systems to maintain optimal engine temperature and enhance DG set performance.

Exhaust Pipe Insulation & Supports
Thermal insulation of exhaust lines and installation of clamps and supports to ensure safety and minimize heat loss.
